|
• Turnkey solution design fees included.
•High quality specification
• Sprinkler system
• Air-conditioning
• 85 Bedroom studio/apartments
• 38 week programme
• Fully fitted out modules. |
|
| |
|
Base Model
•Typical 111 bedrooms other plans available
•Fast track construction- 30 weeks typical
•Cost base model including external car park
•Fully inclusive –FFE-air conditioning –consultant
fees

|
 |
|
Stilted Option
• Typical
111 bedrooms other plans available • Fast track
construction- 30 weeks typical
• Cost base model
stilted option on existing car park
• Fully inclusive –FFE-air
conditioning –consultant fees
|
|
 |
| |
|
Retail Option
• Typical 111
bedrooms other plans available
• Fast track
construction- 30 weeks typical
• Cost base model
stilted option on existing car park with
shell only retail infill
• Fully inclusive –FFE-air
conditioning –consultant fees
|
 |
|
|
Typical Apartment
Finishes |
|
|
|
|
|
|